So today I swear I will get all my "slate" shingles colored, cut, and ready to go on Garth Manor. I already have a bunch but not near as many as I need. Here is a link to the tutorial where I learned about egg carton slate shingles:
http://blog.treefeathers.com/2008/11/making-aged-slate-roof-shingles.html
I hate that I have to go to work right now. Working a job cuts way too deep into my mini time. I slept like poo last night because I had epic dreams that kept waking me up. And all of them had a soundtrack:
Return To Oz by the Scissor Sisters. I still have the song stuck in my head. I love the Scissor Sisters but that song is very depressing.
Anyway, I will feel much better once the shingles are on. I still need to make the windows but it is proving more challenging than I anticipated. Because the clay work created such a thick wall, I can't even "cheat" and buy pre-made windows because they won't fit without extensive modification. I am just waiting for a solution to pop into my head. I have the windows framed out, just need to finish them. I have decided to salvage the door that came with the kit since it will be boarded up anyway. Putting so much work into a scratch door will just be a waste.
I am also perplexed about the interior. The house has been long abandoned so furnishings should be minimal since they will have all been stolen. How much is the interior damaged by the elements. How busted out is the glass in the windows? The closer I get to having to figure these details out, the more I keep changing things. Ugh. I feel like I will never finish.
I will just breathe and take it one step at a time. After all, the sooner I get through this project, the sooner I will be able to start the next one. And it will be perfect timing since I will need to work on a happy themed project to get me through the next 8 months of grey skies, rain, and (hopefully) some snow.
Ramble, ramble, ramble. I hope you all have a great day and I hope to have some pics showing progress within the next couple of days.